|
Welcome to Kaspa Research
|
|
1
|
1990
|
September 22, 2019
|
|
Random Linear Network Coding For Scalable BlockDAG
|
|
5
|
374
|
October 9, 2025
|
|
Pruning safety in the vProgs architecture
|
|
1
|
307
|
September 26, 2025
|
|
Data Availability Concerns
|
|
6
|
803
|
September 17, 2025
|
|
A Basic Framework For Proofs Stitching
|
|
2
|
671
|
August 24, 2025
|
|
# On transaction scopes and the visibility of the object DAG
|
|
0
|
292
|
August 20, 2025
|
|
Zoom-in: A formal backbone model for the vProg computation DAG
|
|
7
|
911
|
August 19, 2025
|
|
Concrete proposal for a synchronously composable verifiable programs architecture
|
|
3
|
3467
|
August 17, 2025
|
|
A proposal towards elastic throughput
|
|
2
|
1150
|
June 3, 2025
|
|
On the inherent tension between multileader consensus and inclusion-time proving
|
|
2
|
588
|
May 27, 2025
|
|
KIP Draft: Threshold Address Format for KIP-10 Mutual Transactions
|
|
1
|
195
|
May 22, 2025
|
|
Crescendo Hardfork discussion thread
|
|
5
|
1037
|
March 5, 2025
|
|
On the design of based ZK rollups over Kaspa's UTXO-based DAG consensus
|
|
8
|
3771
|
February 23, 2025
|
|
KIP 15 discussion thread
|
|
0
|
190
|
February 23, 2025
|
|
Additional practical considerations re hash function and zk opcodes
|
|
22
|
1778
|
February 12, 2025
|
|
Sync Monitor / Mining Rule Engine
|
|
0
|
230
|
February 1, 2025
|
|
Thoughts about covenant and async message standardization
|
|
0
|
467
|
January 31, 2025
|
|
Subnets sequencing commitments
|
|
5
|
718
|
January 31, 2025
|
|
L1<>L2 canonical bridge (entry/exit mechanism)
|
|
1
|
1141
|
January 28, 2025
|
|
Conflicting Proofs Policy
|
|
1
|
359
|
January 24, 2025
|
|
Optimal Transaction Selection - A Multidimensional Knapsack Problem
|
|
0
|
259
|
January 18, 2025
|
|
Fees and throughput regulation dynamics
|
|
3
|
1253
|
January 22, 2025
|
|
Updateable list of L1<>L2 topics to flesh out before finalizing design
|
|
0
|
1143
|
December 23, 2024
|
|
Including transactions of red blocks
|
|
3
|
1339
|
December 11, 2024
|
|
Atomic Composability and other considerations for L1/L2 support
|
|
0
|
6434
|
November 12, 2024
|
|
Quadratic storage mass and KIP9
|
|
10
|
1599
|
November 13, 2024
|
|
Auto-compounding/Additive addresses — KIP10 draft
|
|
20
|
2124
|
November 4, 2024
|
|
KIP 6 discussion thread
|
|
3
|
264
|
October 7, 2024
|
|
Some of the intuition behind the design of the invalidation rules for pruning
|
|
1
|
3865
|
October 18, 2023
|
|
Miner funds consolidation
|
|
6
|
1746
|
December 16, 2022
|